US HIGHWAY 101 over FROG WOMAN SLIDE

01-MEN-101-4.95 · County 045, California · Built 1998 · 4 Lanes · 13,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
10 0289
Year Built
1998
Length
158.5 m (520 ft)
Max Span
41.2 m
Width
13 m (42.7 ft)
Lanes
4
Daily Traffic
13,300
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.