STATE ROUTE 271 over BIG DANN CREEK

01-MEN-271-4.92 · County 045, California · Built 1933 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
10 0030
Year Built
1933
Length
178.3 m (585 ft)
Max Span
97.5 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.