STATE ROUTE 89 over LAKE ALMANOR SPILLWAY

02-PLU-089-29.97 · County 063, California · Built 2018 · 2 Lanes · 1,150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
09 0080
Year Built
2018
Length
142.2 m (466.5 ft)
Max Span
40.5 m
Width
13.5 m (44.3 ft)
Lanes
2
Daily Traffic
1,150
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.