JELLYS FERRY RD over SACRAMENTO RIVER

7.1 MI NE OF I-5 · County 103, California · Built 2022 · 2 Lanes · 1,695 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
08C0374
Year Built
2022
Length
385.3 m (1264.1 ft)
Max Span
97.5 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
1,695
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.