SOUTH AVE over JEWETT CREEK
3.6 MI E/O ROAD 99W · County 103, California · Built 1968 · 2 Lanes · 5,576 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
39.906431, -122.132942
This bridge is in worse condition than 95.3% of bridges in County 103. The average bridge in California is 0 years old; this one is 58 years old.
Nearby Bridges
SOUTH AVE over TEHAMA-COLUSA CANAL
Built 1965
Loleta Ave over Tehama-Colusa Canal
Built 1966
HALL RD over JEWETT CREEK
Built 1982
HOAG ROAD over TEHAMA-COLUSA CANAL
Built 1968
MOON ROAD over TEHAMA-COLUSA CANAL
Built 1965
MARY AVENUE over JEWETT CREEK
Built 1995
KOPTA ROAD over SOUTH FORK KOPTA SLOUGH
Built 1981
WISCONSIN AVE over JEWETT CREEK
Built 1948
HALL RD over UNNAMED CREEK
Built 1971
MARGUERITE AVENUE over JEWETT CREEK
Built 1973
Bridge Details
- Structure #
- 08C0166
- Year Built
- 1968
- Length
- 24.6 m (80.7 ft)
- Max Span
- 6.2 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 5,576
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $298,000
- Total Project Cost
- $500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.