SIXTY-EIGHTH AVE over SOUTH FORK ANTELOPE CRK
AT SR 99 · County 103, California · Built 1929 · 2 Lanes · 500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
40.10845, -122.110044
This bridge is in worse condition than 95.3% of bridges in County 103. The average bridge in California is 0 years old; this one is 97 years old.
Nearby Bridges
STATE ROUTE 99 over ANTELOPE CREEK
Built 2003
68TH AVE over UNNAMED SLOUGH
Built 1930
KANSAS AVENUE over LONG GULCH
Built 1957
DAY AVENUE over UNNAMED SLOUGH
Built 1968
SHASTA BLVD over JUNIPER GULCH
Built 1956
KANSAS AVE over ANTELOPE CREEK
Built 1937
KAUFFMAN AVE over LONG GULCH
Built 1984
STATE ROUTE 99 over DYE CREEK
Built 2006
KAUFFMAN AVE over UNNAMED CHANNEL
Built 1984
KAUFFMAN AVE over ANTELOPE CREEK
Built 1987
Bridge Details
- Structure #
- 08C0104
- Year Built
- 1929
- Reconstructed
- 1996
- Length
- 11.6 m (38.1 ft)
- Max Span
- 5.5 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $163,000
- Total Project Cost
- $274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.