RD 302 (LAMBERT) over HARTSON SLOUGH OVERFLOW

0.3 MI SOUTH OF US 395 · County 035, California · Built 2011 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
07C0097
Year Built
2011
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
100
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.