SHARON AVE over A.C.I.D CANAL

300 N/W RUSSELL ST · County 089, California · Built 2022 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06C0391
Year Built
2022
Length
16.7 m (54.8 ft)
Max Span
16.1 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.