PINE GROVE AVENUE over SALT CREEK

0.2 MI W I-5. · County 089, California · Built 2000 · 3 Lanes · 3,630 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
06C0356
Year Built
2000
Length
36.2 m (118.8 ft)
Max Span
12.2 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
3,630
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.