FIRST STREET over CROWLEY GULCH

.2 MI W/O SR5 · County 089, California · Built 1960 · 2 Lanes · 1,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06C0296
Year Built
1960
Reconstructed
1967
Length
18 m (59.1 ft)
Max Span
5.8 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
1,500
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.