JIM DAY ROAD over PIT RIVER

0.4 MI S/E OF SR 299 · County 089, California · Built 1973 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06C0013
Year Built
1973
Length
84.1 m (275.9 ft)
Max Span
41.1 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
200
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.