STATE ROUTE 273 over CLEAR CREEK

02-SHA-273-11.23 · County 089, California · Built 1995 · 5 Lanes · 21,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06 0203
Year Built
1995
Length
143.3 m (470.1 ft)
Max Span
42.7 m
Width
28.8 m (94.5 ft)
Lanes
5
Daily Traffic
21,400
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.