STATE ROUTE 44 over CHURN CREEK

02-SHA-044-R1.56-RDG · County 089, California · Built 1968 · 2 Lanes · 24,250 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06 0153R
Year Built
1968
Reconstructed
1985
Length
62.5 m (205.1 ft)
Max Span
12.5 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
24,250
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.