INTERSTATE 5 NB over STATE ROUTE 273
02-SHA-005-R3.82 · County 089, California · Built 1966 · 3 Lanes · 19,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
40.430728, -122.284286
This bridge is in worse condition than 14.6% of bridges in County 089. The average bridge in California is 0 years old; this one is 60 years old.
Nearby Bridges
INTERSTATE 5 SB over STATE ROUTE 273
Built 1966
INTERSTATE 5 over ANDERSON CREEK OVERFLOW
Built 1966
INTERSTATE 5 NB over DESCHUTES ROAD
Built 1966
LOCUST RD over A.C.I.D. CANAL
Built 1963
DESCHUTES RD over UP RR AMTRAK BARNEY ST
Built 1966
INTERSTATE ROUTE 5 over UPRR RAILROAD TRACKS
Built 2022
STATE ROUTE 273 over A.C.I.D. CANAL
Built 1948
PINON AVE over SACRAMENTO GULCH
Built 1956
INTERSTATE ROUTE 5 over ANDERSON CREEK
Built 2022
EMILY RD over ANDERSON CREEK
Built 1980
Bridge Details
- Structure #
- 06 0139R
- Year Built
- 1966
- Reconstructed
- 2011
- Length
- 48.3 m (158.5 ft)
- Max Span
- 21.7 m
- Width
- 17.9 m (58.7 ft)
- Lanes
- 3
- Daily Traffic
- 19,500
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.