RUTH-ZENIA ROAD over VAN DUZEN RIVER

14.8 MI FROM SR 36 · County 105, California · Built 2003 · 2 Lanes · 88 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
05C0223
Year Built
2003
Length
38 m (124.7 ft)
Max Span
12.5 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
88
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.