CANYON CREEK ROAD over CLEAR GULCH

1.4 MI NE SR 299 JCT CITY · County 105, California · Built 1955 · 2 Lanes · 75 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
05C0166
Year Built
1955
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
75
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.