HYAMPOM ROAD over HAYFORK CREEK

23.2 MI WEST OF SR 3 · County 105, California · Built 1978 · 2 Lanes · 330 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
05C0118
Year Built
1978
Length
74.4 m (244.1 ft)
Max Span
37 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
330
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.