SUMMIT CREEK ROAD over CARR CREEK
0.1 MI S OF S.R. 3 · County 105, California · Built 1987 · 2 Lanes · 300 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
40.576103, -123.088608
This bridge is in worse condition than 96.4% of bridges in County 105. The average bridge in California is 0 years old; this one is 39 years old.
Nearby Bridges
STATE ROUTE 3 over CARR CREEK
Built 1968
WILDWOOD ROAD over CARR CREEK
Built 1950
BARKER CR. over BARKER CREEK
Built 2010
STATE ROUTE 3 over BIG CREEK
Built 1938
WILDWOOD ROAD over HAYFORK CREEK
Built 1945
LIMEDYKE LOOKOUT over INDIAN VALLEY CREEK
Built 1987
BIG CREEK ROAD over BIG CREEK
Built 1960
OAK AVE over HAYFORK CREEK
Built 2004
STATE ROUTE 3 over HAYFORK CREEK
Built 2006
EAST FORK ROAD over POTATO CREEK
Built 1950
Bridge Details
- Structure #
- 05C0105
- Year Built
- 1987
- Length
- 18.3 m (60 ft)
- Max Span
- 16.7 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $178,000
- Total Project Cost
- $299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.