NO DATA ENTERED over M-FORK STANISLAUS RIVER

04N27 · County 009, California · Built 1999 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
051653000003002
Year Built
1999
Length
18.6 m (61 ft)
Max Span
18.3 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
50
Material
Steel
Design
Girder and Floorbeam System
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.