NO DATA ENTERED over BEAR CREEK

BEAVER · County 093, California · Built 1990 · 1 Lanes · 5 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
050551000001058
Year Built
1990
Length
12.2 m (40 ft)
Max Span
11.6 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
5
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.