BEAR CANYON ROAD over SOUTH FORK EEL RIVER

0.3 MI SW/O REDWOOD DR · County 023, California · Built 2000 · 2 Lanes · 158 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
04C0129
Year Built
2000
Length
198 m (649.6 ft)
Max Span
59.4 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
158
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.