ZENIA BLUFF RD over SOUTH DOBBYN CREEK
2 MI E/O ALDERPOINT RD · County 023, California · Built 1949 · 2 Lanes · 85 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
40.191172, -123.564681
This bridge is in worse condition than 95% of bridges in County 023. The average bridge in California is 0 years old; this one is 77 years old.
Nearby Bridges
ALDERPOINT RD over SOUTH DOBBYN CREEK
Built 1937
ALDERPOINT RD over EEL RIVER & NWP RR
Built 1972
ZENIA BLUFF RD over MUD CREEK
Built 2003
ALDERPOINT ROAD over NORTH DOBBYN CREEK
Built 1966
FORT SEWARD RD over EEL RIVER
Built 1958
STEELHEAD RD over POWERS CREEK
Built 2007
FORT SEWARD ROAD over DOBBYN CREEK
Built 1960
ALDERPOINT RD over CONLEY CREEK
Built 1990
ALDERPOINT ROAD over COOPER CREEK
Built 1952
RUTH-ZENIA ROAD over LITTLE VAN DUZEN RIVER
Built 1971
Bridge Details
- Structure #
- 04C0064
- Year Built
- 1949
- Length
- 27.4 m (89.9 ft)
- Max Span
- 16.7 m
- Width
- 6.4 m (21 ft)
- Lanes
- 2
- Daily Traffic
- 85
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $178,000
- Total Project Cost
- $299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.