HOWARD HEIGHTS RD over FRESHWATER CREEK

0.01 MI SW FRESHWATER RD · County 023, California · Built 1949 · 2 Lanes · 172 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
04C0049
Year Built
1949
Length
29.3 m (96.1 ft)
Max Span
11.6 m
Width
6.3 m (20.7 ft)
Lanes
2
Daily Traffic
172
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.