BALD HILLS ROAD over PRAIRIE CREEK
0.01 MI E/O SR 101 · County 023, California · Built 1957 · 2 Lanes · 479 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
41.301567, -124.047475
This bridge is in worse condition than 95% of bridges in County 023. The average bridge in California is 0 years old; this one is 69 years old.
Nearby Bridges
U.S. HIGHWAY 101 over PRAIRIE CREEK
Built 1989
U.S. HIGHWAY 101 over REDWOOD CREEK
Built 1988
DAVISON ROAD over PRAIRIE CREEK
Built 1970
DAVISON RD over PRAIRIE CREEK
Built 1988
U.S. HIGHWAY 101 over REDWOOD CREEK OVERFLOW
Built 1950
U.S. HIGHWAY 101 over LITTLE LOST MAN CREEK
Built 2020
GENEVA ROAD over LITTLE LOST MAN CREEK
Built 2021
U.S. HIGHWAY 101 over LOST MAN CREEK
Built 1986
GENEVA ROAD over LOST MAN CREEK
Built 1973
REDWOOD HWY over MAY CREEK
Built 1989
Bridge Details
- Structure #
- 04C0005
- Year Built
- 1957
- Length
- 35.4 m (116.1 ft)
- Max Span
- 16.6 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 479
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $303,000
- Total Project Cost
- $509,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.