PAINTER ST over US HIGHWAY 101

01-HUM-101-R52.89-RDEL · County 023, California · Built 1976 · 2 Lanes · 890 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
04 0236
Year Built
1976
Length
80.8 m (265.1 ft)
Max Span
44.2 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
890
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.