U.S. HIGHWAY 101 over ORCHARD AVE

01-HUM-101-72.03 · County 023, California · Built 1963 · 4 Lanes · 25,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
04 0122
Year Built
1963
Length
39.9 m (130.9 ft)
Max Span
19.8 m
Width
25.2 m (82.7 ft)
Lanes
4
Daily Traffic
25,700
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.