JONES LN -CO RD 61 over MIDDLE CANAL

0.6 MI W SH 395 · County 049, California · Built 2013 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
03C0128
Year Built
2013
Length
16.5 m (54.1 ft)
Max Span
16.3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.