Pruett Rd/Railroad over All-American Canal

Within City of Calexico · County 025, California · Built 1938 · 4 Lanes · 400 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
0304-0102
Year Built
1938
Length
69.8 m (229 ft)
Max Span
69.2 m
Width
7 m (23 ft)
Lanes
4
Daily Traffic
400
Material
Concrete Continuous
Design
Culvert
Owner
Bureau of Reclamation
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.