CECILVILLE ROAD over HOTELLING GULCH

3 MI E OF FORKS OF SALMON · County 093, California · Built 2022 · 2 Lanes · 120 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
02C0287
Year Built
2022
Length
8.5 m (27.9 ft)
Max Span
7.8 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
120
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.