STATE ROUTE 96 over SALMON RIVER

02-SIS-096-R0.04 · County 093, California · Built 1974 · 2 Lanes · 410 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
02 0177
Year Built
1974
Length
268.2 m (879.9 ft)
Max Span
57.6 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
410
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.