U.S. HIGHWAY 101 over SMITH RIV SOUTH BANK RD

01-DN-101-36.06 · County 015, California · Built 2023 · 2 Lanes · 7,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
01 0042
Year Built
2023
Length
305.4 m (1002 ft)
Max Span
61 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
7,200
Material
Steel Continuous
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.