IRR BIA RTE 18 over PINE CREEK

1.5KM S MARTIN FERRY BD. · County 023, California · Built 1977 · 2 Lanes · 40 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
00000000000J140
Year Built
1977
Length
37.3 m (122.4 ft)
Max Span
19.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
40
Material
Prestressed Concrete
Design
Tee Beam
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$342,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.