IRR BIA RTE 735 over SUKKWAN STRAIT
3.0 MILES EAST OF HYDABUR · County 198, Alaska · Built 1970 · 2 Lanes · 5 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
55.201719, -132.825606
This bridge is in worse condition than 93.4% of bridges in County 198. The average bridge in Alaska is 0 years old; this one is 56 years old.
Nearby Bridges
HYDABURG HIGHWAY over HYDABURG RIVER
Built 1985
IRR:MIIJUU WAY over HYDABURG CREEK
Built 1970
SALTRY POINT ROAD over UNNAMED CREEK
Built 1995
IRR BIA RTE 461 over UNNAMED CREEK
Built 1982
HYDABURG HIGHWAY over SATA CREEK
Built 1982
IRR BIA RTE 461 over UNNAMED CREEK
Built 1980
IRR BIA RTE 461 over UNNAMED CREEK
Built 1980
IRR BIA RTE 461 over UNNAMED CREEK
Built 1980
HYDABURG HIGHWAY over NATZUHINI CREEK
Built 1985
HYDABURG HIGHWAY over UNNAMED CREEK @ STA 287
Built 1985
Bridge Details
- Structure #
- E09211T0735-010
- Year Built
- 1970
- Reconstructed
- 1981
- Length
- 153.2 m (502.6 ft)
- Max Span
- 6.1 m
- Width
- 14.6 m (47.9 ft)
- Lanes
- 2
- Daily Traffic
- 5
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,500,000
- Total Project Cost
- $2,250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.