IRR BIA RTE 461 over UNNAMED CREEK
12.05 MILES EAST OF HYDAB · County 198, Alaska · Built 1982 · 1 Lanes · 45 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
55.288483, -132.623922
This bridge is in worse condition than 80.1% of bridges in County 198. The average bridge in Alaska is 0 years old; this one is 44 years old.
Nearby Bridges
IRR BIA RTE 461 over UNNAMED CREEK
Built 1982
IRR BIA RTE 461 over UNNAMED CREEK
Built 1982
IRR BIA RTE 461 over UNNAMED CREEK
Built 1982
2100000-14.38 over NO DATA ENTERED
Built 2005
2100000-12.53 over WATERWAY
Built 2024
2100000-12.741 over MOD
Built 1989
UNNAMED ROAD over UNNAMED CREEK
Built 1995
2100000-15.18 over PERM
Built 1985
IRR BIA RTE 461 over UNNAMED CREEK
Built 1980
IRR BIA RTE 461 over UNNAMED CREEK
Built 1980
Bridge Details
- Structure #
- E09211T0461-160
- Year Built
- 1982
- Length
- 21.3 m (69.9 ft)
- Max Span
- 20 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 45
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $30,000
- Total Project Cost
- $45,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.