QUARRY ROAD over FRENCH CREEK
Approximately 0.6 miles e · County 090, Alaska · Built 1990 · 2 Lanes · 300 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
64.6555, -147.025639
This bridge is in worse condition than 50% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 36 years old.
Nearby Bridges
EIEL PIPELINE ROAD over FRENCH CREEK
Built 1990
MANCHU TRAIL over FRENCH CREEK
Built 1960
MANCHU LAKE RD over MOOSE CREEK
Built 2005
OLD VALDEZ TRAIL over PILEDRIVER SLOUGH
Built 2003
OLD VALDEZ TRAIL over TWENTY-THREE MILE SLOUGH
Built 2004
RICHARDSON HWY NB over EIELSON ACCESS UC
Built 2006
TRANSMITTER ROAD over MOOSE CREEK
Built 1960
EIELSON FARM ROAD over PILEDRIVER SLOUGH
Built 2003
RICHARDSON HIGHWAY over MOOSE CREEK EAST BOUND
Built 1971
RICHARDSON HIGHWAY over MOOSE CREEK WEST BOUND
Built 1971
Bridge Details
- Structure #
- AFAKFTQW08004
- Year Built
- 1990
- Length
- 6.6 m (21.7 ft)
- Max Span
- 5.7 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $60,000
- Total Project Cost
- $90,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.