POLE LINE ROAD over EAGLE RIVER
Approximately 0.6 miles s · County 020, Alaska · Built 1970 · 1 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
61.317383, -149.603483
This bridge is in worse condition than 50.7% of bridges in County 020. The average bridge in Alaska is 0 years old; this one is 56 years old.
Nearby Bridges
GLENN HIGHWAY over EAGLE RIVER SOUTHBOUND 2
Built 2020
ARTILLERY ROAD over ARTILLERY RD OVERXING
Built 1974
GLENN HIGHWAY over EAGLE RIVER NORTHBOUND 2
Built 2015
EAGLE VIEW DRIVE over EAGLE RIVER W FRONTAGE
Built 1974
VFW ROAD over EAGLE RIVER E FRONTAGE
Built 1981
EAGLE RIVER LOOP over EAGLE RIVER
Built 1992
EAGLE RIVER LOOP over HILAND DRIVE OVERXING
Built 1974
EAGLE RIVER ACCESS over NORTH EAGLE RIVER O.C.
Built 1991
EAGLE RIVER LOOP over DRIFTWOOD BAY DR. UC
Built 1992
WEST LAKE RIDGE DR over FIRE CREEK
Built 2007
Bridge Details
- Structure #
- AFAKFSXB95109
- Year Built
- 1970
- Length
- 42.7 m (140.1 ft)
- Max Span
- 42.7 m
- Width
- 3.8 m (12.5 ft)
- Lanes
- 1
- Daily Traffic
- 100
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $95,000
- Total Project Cost
- $143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.