KLONDIKE HIGHWAY over CAPTAIN WM MOORE CREEK
MILE POINT 11.2 · County 230, Alaska · Built 2019 · 2 Lanes · 410 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
59.585086, -135.197344
This bridge is in worse condition than 16.7% of bridges in County 230. The average bridge in Alaska is 0 years old; this one is 7 years old.
Bridge Details
- Structure #
- 4111
- Year Built
- 2019
- Length
- 43.6 m (143 ft)
- Max Span
- 22.9 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 410
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.