CHENA HOT SPR RD over NORTH FORK CHENA RIVER
MILE POINT 37.1 · County 090, Alaska · Built 2003 · 2 Lanes · 2,229 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
64.900322, -146.433719
This bridge is in worse condition than 16.1% of bridges in County 090. The average bridge in Alaska is 0 years old; this one is 23 years old.
Bridge Details
- Structure #
- 4058
- Year Built
- 2003
- Length
- 8.5 m (27.9 ft)
- Max Span
- 1.8 m
- Lanes
- 2
- Daily Traffic
- 2,229
- Material
- Steel
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.