STERLING HIGHWAY over EAST FORK MOOSE RIVER
MILE POINT 35.1 · County 122, Alaska · Built 2018 · 2 Lanes · 3,180 vehicles/day
Overall
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
60.530897, -150.462172
This bridge is in worse condition than 21.6% of bridges in County 122. The average bridge in Alaska is 0 years old; this one is 8 years old.
Nearby Bridges
Bridge Details
- Structure #
- 2270
- Year Built
- 2018
- Length
- 42.7 m (140.1 ft)
- Max Span
- 41.8 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 3,180
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.