EGAN DRIVE over SUNNY POINT DR UC SB

MILE POINT 6.1 · County 110, Alaska · Built 2008 · 2 Lanes · 10,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
2192
Year Built
2008
Length
18.3 m (60 ft)
Max Span
17.4 m
Width
20.7 m (67.9 ft)
Lanes
2
Daily Traffic
10,100
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.