DALTON HIGHWAY over OKSRUKUYIK CREEK NO. 2

MILE POINT 313.9 · County 185, Alaska · Built 2011 · 2 Lanes · 130 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 9 Excellent
Substructure 8 Very Good

Location

68.867408, -148.849294

This bridge is in worse condition than 43.8% of bridges in County 185. The average bridge in Alaska is 0 years old; this one is 15 years old.

Bridge Details

Structure #
2146
Year Built
2011
Length
37.2 m (122 ft)
Max Span
36.3 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
130
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.