EUREKA-RAMPART RD over BOSTON CREEK
MILE POINT 2.2 · County 290, Alaska · Built 2005 · 2 Lanes · 10 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
65.190636, -150.225222
This bridge is in worse condition than 11.7% of bridges in County 290. The average bridge in Alaska is 0 years old; this one is 21 years old.
Bridge Details
- Structure #
- 2098
- Year Built
- 2005
- Length
- 35.4 m (116.1 ft)
- Max Span
- 34.4 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.