MINNESOTA DRIVE over AIRPORT SPUR OVERHEAD

MILE POINT 4.9 · County 020, Alaska · Built 1999 · 7 Lanes · 31,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1973
Year Built
1999
Length
44.5 m (146 ft)
Max Span
43.6 m
Width
39.4 m (129.3 ft)
Lanes
7
Daily Traffic
31,600
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.