AIRPORT RD YAKUTAT over OPHIR CREEK

MILE POINT 0.3 · County 282, Alaska · Built 1998 · 2 Lanes · 960 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 8 Very Good

Location

59.5427, -139.736367

This bridge is in worse condition than 25% of bridges in County 282. The average bridge in Alaska is 0 years old; this one is 28 years old.

Nearby Bridges

Bridge Details

Structure #
1971
Year Built
1998
Length
24.1 m (79.1 ft)
Max Span
23.2 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
960
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.