AIRPORT RD YAKUTAT over OPHIR CREEK
MILE POINT 0.3 · County 282, Alaska · Built 1998 · 2 Lanes · 960 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
59.5427, -139.736367
This bridge is in worse condition than 25% of bridges in County 282. The average bridge in Alaska is 0 years old; this one is 28 years old.
Nearby Bridges
Bridge Details
- Structure #
- 1971
- Year Built
- 1998
- Length
- 24.1 m (79.1 ft)
- Max Span
- 23.2 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 960
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.