SEWARD HIGHWAY over CANYON CREEK

MILE POINT 55.8 · County 122, Alaska · Built 1997 · 2 Lanes · 4,268 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

60.781322, -149.431628

This bridge is in worse condition than 27.5% of bridges in County 122. The average bridge in Alaska is 0 years old; this one is 29 years old.

Nearby Bridges

Bridge Details

Structure #
1964
Year Built
1997
Length
271.6 m (891.1 ft)
Max Span
42.1 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
4,268
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.