IRR:MARINE HWY RTE over AKUTAN CITY DOCK

AKUTAN · County 013, Alaska · Built 1992 · 3 Lanes · 10 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

54.133139, -165.777239

This bridge is in worse condition than 68.8% of bridges in County 013. The average bridge in Alaska is 0 years old; this one is 34 years old.

Bridge Details

Structure #
1946
Year Built
1992
Length
31.4 m (103 ft)
Max Span
6.1 m
Width
12.2 m (40 ft)
Lanes
3
Daily Traffic
10
Material
Concrete
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.