SAYLES/GORGE ST over SAYLES/GORGE VIADUCT

MILE POINT 0.1 · County 130, Alaska · Built 1960 · 1 Lanes · 40 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
1841
Year Built
1960
Length
38.7 m (127 ft)
Max Span
4.9 m
Width
5.8 m (19 ft)
Lanes
1
Daily Traffic
40
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.