IRR:NOME-COUNCIL over EAST FORK SOLOMON RIVER

MILE POINT 44.1 · County 180, Alaska · Built 1987 · 2 Lanes · 160 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 5 Fair

Location

64.695811, -164.198364

This bridge is in worse condition than 46.7% of bridges in County 180. The average bridge in Alaska is 0 years old; this one is 39 years old.

Nearby Bridges

Bridge Details

Structure #
1689
Year Built
1987
Length
45.7 m (149.9 ft)
Max Span
22.6 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
160
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.