IRR:NOME-COUNCIL over EAST FORK SOLOMON RIVER
MILE POINT 44.1 · County 180, Alaska · Built 1987 · 2 Lanes · 160 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
64.695811, -164.198364
This bridge is in worse condition than 46.7% of bridges in County 180. The average bridge in Alaska is 0 years old; this one is 39 years old.
Bridge Details
- Structure #
- 1689
- Year Built
- 1987
- Length
- 45.7 m (149.9 ft)
- Max Span
- 22.6 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 160
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.