IRR:NOME-TAYLOR RD over CRATER CREEK
MILE POINT 43.3 · County 180, Alaska · Built 1983 · 2 Lanes · 249 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
64.930678, -164.874983
This bridge is in worse condition than 10% of bridges in County 180. The average bridge in Alaska is 0 years old; this one is 43 years old.
Nearby Bridges
Bridge Details
- Structure #
- 1564
- Year Built
- 1983
- Length
- 30.5 m (100.1 ft)
- Max Span
- 29.6 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 249
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.