DALTON HIGHWAY over ROCHE MOUTONNEE CREEK
MILE POINT 265.5 · County 185, Alaska · Built 2017 · 2 Lanes · 130 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
68.375544, -149.314636
This bridge is in worse condition than 31.3% of bridges in County 185. The average bridge in Alaska is 0 years old; this one is 9 years old.
Bridge Details
- Structure #
- 1519
- Year Built
- 2017
- Length
- 37.2 m (122 ft)
- Max Span
- 36.3 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 130
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.